Machinery and Equipment Rental Service
Our company offers to fulfil complex requirements connected with the installation of temporary or provisional electrical equipment within equipping a construction site, when building a new infrastructure or when reconstructing existing objects. The scope of our offer is from the creation of a connection point to the installation of a temporary transformer station and, where the investor is interested, the building of secondary electrical distribution systems. The services offered include technical and design support, negotiations of a proposed solution with the parties concerned, implementation itself and the subsequent disassembly of the equipment after the end of the lease.
The implementation of a solution offered above can be carried out in the form of a full or partial lease by agreement. Further, ensuring regular servicing or an emergency mode or regular inspections of equipment by an inspection technician can be agreed for the term of lease.
To execute quickly services offered, our company has a sufficient number of 22/0.4 kV kiosk transformer stations with the possibility of fitting a transformer of an output according to the current construction requirements (250 kVA, 400 kVA or 630 kVA). If required by the customer, a construction can be equipped with sub-switch boards with measurement at individual end distribution systems.
If you are interested, please contact Mrs. Svobodová, tel.: +420 311 604 911, +420 605 295 322, e-mail: svobodova@eks.cz.
Price List of Equipment for Lease
Kiosk transformer station 22/0.4 kV | ||
Lease of a transformer station 22/0.4 kV, 400 kVA | 15,800 | CZK/month |
Lease of a transformer station 22/0.4 kV, 630 kVA | 16,300 | CZK/month |
Backbone distribution system TN-C, plastic, pillar | ||
Box SP, 160 A, TN-C | 588 | CZK/month |
Box SR, 400 A, TN-C | 1,016 | CZK/month |
Construction site switchboard 125 A, TN-C | 1,144 | CZK/month |
Construction site switchboard 250 A, TN-C, atypical | 1,576 | CZK/month |
Construction site switchboard, direct measurement, 100 A, TN-C | 1,416 | CZK/month |
Construction site switchboard, indirect measurement, 250 A, TN-C, atypical | 1,464 | CZK/month |
Secondary distribution system TN-C-S, sheet, column | ||
Construction site switchboard 63 A, TN-C-S | 968 | CZK/month |
Construction site switchboard with a consumption meter 63 A, TN-C-S | 1,072 | CZK/month |
Construction site switchboard 80 A, TN-C-S | 1,000 | CZK/month |
Construction site switchboard with a consumption meter 80 A, TN-C-S | 1,120 | CZK/month |
Construction site switchboard 125 A, TN-C-S | 1,230 | CZK/month |
Construction site switchboard with a consumption meter 125 A, TN-C-S | 1,384 | CZK/month |
End distribution system TN-S, sheet, column | ||
Construction site switchboard 40 A, TN-S, sheet | 864 | CZK/month |
Construction site switchboard 63 A, TN-S, sheet | 984 | CZK/month |
End distribution system TN-S, plastic | ||
Construction site switchboard 40 A, TN-S, plastic | 653 | CZK/month |
Construction site switchboard with a consumption meter 40 A, TN-S, plastic | 788 | CZK/month |
Heating | ||
Electrical heating unit – up to 10 kW | 750 | CZK/month |
Electrical heating unit – up to 20 kW | 1,410 | CZK/month |
Lighting | ||
Fluorescent fitting 2×36 W, IP54 | 53 | CZK/month |
Vacuum tube fitting 1×150 W, SHC, IP54 | 188 | CZK/month |
Mobile column 3×2×58 W, IP54 | 443 | CZK/month |