References
Reconstruction in the Štěchovice Hydroelectric Power Plant
Client: ČEZ, a.s.
Date of implementation: 4/1993 – 5/1995
Type of work:
- Reconstruction of an outdoor 110 kV switching station, incl. steel structure paints using the Amerlock system
- Reconstruction of a 10.5 kV switching station, incl. cable interconnections
- Reconstruction of a LV switching station
- Replacement of 10.5/110 kV transformers, 5 MVA
ELEKTROSTAV Koudela a.s. © 2012 | Developed by Kinet