Tabák a.s. – Phases 1 and 2 of the Construction of a New Plant – Electrical Part

Client: TABÁK, a.s.

Date of implementation: 1993-1994

Type of work:

  • 22-AXEKCEY supply cables – Raychem terminals
  • Supply and installation of a box switching station of ABB EJF a.s.
  • Supply and installation of 4 pieces of PAUWELS 22/0.4 kV transformers; 1,600 kVA incl. leading the output using a CANALIS KH 2,500 A bus-bar system
  • Supply and installation of a Catterpillar 360 kVA diesel set, incl. a fuel system
  • Manufacture, supply and installation of switchboards for main and secondary LV switching stations
  • Complete power LV electrical installation
  • Light-current distribution systems – telephone, time, electronic fire alarm systems, paging, and failure signalling
  • Inspection reports and the debugging, setting and putting of equipment into operation
  • Implementation project
References Elektrostav Koudela a.s. References Elektrostav Koudela a.s. References Elektrostav Koudela a.s.
References Elektrostav Koudela a.s. References Elektrostav Koudela a.s. References Elektrostav Koudela a.s.
ELEKTROSTAV Koudela a.s. © 2012 | Developed by Kinet